English EspañolMaxtend CA | Maxtend SECURA | Maxtend RA

Step 2 - Commissioning of Maxtend® System

  1. CO2 scrubber pads (if required) are placed in position while loading
  2. A plastic sealing curtain is fitted to prevent atmosphere leakage
  3. Initial atmosphere established by gas flushing of container
  4. Controller Installed and final pre check testing completed
  5. Safety warning notice is placed on container prior to shipping
    (note arrow in picture)

Back to Maxtend® CA main